Projekt · Dnr 2019-01176 · Källa: Vinnova
E!12842, WISDOM, Vattenfall
- Koordinator
- Vattenfall AB, Arenastaden, Stockholm
- Projekttid
- 2019-02-01 till 2022-03-31 (avslutat)
- Beviljat bidrag
- 384 054 SEK
- Diarienummer
- 2019-01176
Beskrivning
Very ambitious and interesting project for Vattenfall, with the possibility to improve our wind farm performance. Unfortunately we did not succeed in performing onsite tests with the expected RADAR system, luckily Vattenfall was partner in another project “Total Control” where measurments at Lillgrund wind farm with a scanning LIDAR was transferred to the WISDOM project partners for application and model development and verification. With this Plan B we succeeded in developing a set of useful applications and models for wind farm operation and optimization. WMT didn’t manage to measure with the RADAR system at Lillgrund, and therefore the potential for optimizing the wind farm are much smaller. Still some models for wind farm optimization have been developed with the LIDAR data from the “Total Control” project. These models are still useful but not as effective when we don’t get online turbulence intensity data input from the operating wind farm.
Hittar Vinnova inte sidan? Sök på diarienumret hos Vinnova.
Liknande
-
E!12759, WITURBISA, Chalmers
Chalmers Tekniska Högskola AB · 2019-06-01 · 999 889 SEK · Projekt
The project has contributed to mitigating collisions between bird and wind turbine on a species level, especially in terms of the ability to identify birds in wind farms automatically +The classification of birds required images with bird at short range to perform optimally. +It was clearly demonstr…
-
Horns Rev1 (Danish Offshore Windfarm - O&M), Preventative Services
Vattenfall AB Procurement Heat Sweden · 2024-05-17 · 119 800 000 DKK · Upphandling
Preventative services and additional campaigns on Danish Offshore windfarm Horns Rev1 (HR1) Horns Rev 1 Offshore Wind Farm (HR1) is located around 14 km vest of Esbjerg in the north sea. The site consists of an Offshore substation (OSS) and 80 Vestas V80 – 2MW turbines with a max. capacity of 160 MW…
-
Lövstaviken Wind Farm - Maintenance and Service Contract
Falkenbergs Kommun · 2024-03-21 · sista anbudsdag 2024-04-30 · 65 000 000 SEK · Upphandling
The tender procedure concerns a Maintenance and Service Agreement (MSA), and some optional repair and upgrade works for the five (5) Enercon E-70 wind turbines constituting Lövstaviken Wind Farm, located outside the harbour of Falkenberg, Sweden.
-
Open Cyber-Physical System Model-Driven Certified Development (OPENCPS)
Siemens Industrial Turbomachinery AB · 2015-12-01 · 1 200 000 SEK · Projekt
Driven by the need to limit global warming, the energy systems are in a phase of expanding renewable energy as an alternative to conventional power plants. The design and control of power plants are expected to become increasingly more important as a method of balancing the electric networks with a …
-
Digital Tvilling för Automatiserad Flygprovutvärdering och Modellvalidering
Saab AB · 2020-01-01 · 3 007 330 SEK · Projekt
The overall project goal was to have a implemented and operational framework for automated model validation and anomaly detection in place in industry by the time the next large development project commences. This has been achieved and the Technology Readiness Level (TRL) of the framework is current…