Upphandling · Källa: TED – Tenders Electronic Daily

SÖDERENERGI AB - IGELSTAVERKET BIOCCS PREQUALIFICATION

Köpare
Söderenergi AB
Publicerad
2024-04-26
Värde
Anges inte
CPV-koder
45251000 Bygg- och anläggningsarbeten: kraftverk och värmekraftverk
24112100 Koldioxid
Annons-id
250164-2024

AI-sammanfattningen tas fram …

Beskrivning

Söderenergi produces district heating for some 300 000 persons, offices and industries in the southern part of greater Stockholm, and enough electricity to power 100,000 homes. Söderenergi employs approx:160 people. Our largest plants are the Igelsta plant, IGV, and Igelsta combined heat and power plant, IKV, in Södertälje, as well as the Fittja plant in Botkyrka. Most of our heat production is sold and delivered by Telge Nät in Södertälje and Nykvarn, and by Södertörn’s Fjärrvärme in Huddinge, Botkyrka and Salem. We also supply heating to Stockholm Exergi AB in Stockholm. The host plant, IKV, is Sweden’s second largest biomass-powered combined power and heating plant, and an ideal location for a BECCS facility. There is enough space and energy for the process and we have easy access to our own port. Our goal is to build a BECCS facility ready to capture carbon dioxide and start restoring the climate by 2030. By 2030 around 500 000 tonnes of biogenic carbon dioxide can be captured and stored yearly from the combined heating and power plant, IKV. That corresponds to the combined emissions from the three municipalities that own Söderenergi. This procurement for a BECCS facility consists of several phases, where Söderenergi will select contractors in the following steps, in order to ensure competition for as long as possible and at the same time ensuring the best possible solution for Söderenergi. This procedure is designed based on the fact that there are few examples regarding the area covered by the procurement.

Öppna originalannonsen hos TED

Liknande

  1. Open Cyber-Physical System Model-Driven Certified Development (OPENCPS)

    Siemens Industrial Turbomachinery AB · 2015-12-01 · 1 200 000 SEK · Projekt

    Driven by the need to limit global warming, the energy systems are in a phase of expanding renewable energy as an alternative to conventional power plants. The design and control of power plants are expected to become increasingly more important as a method of balancing the electric networks with a …

  2. P3 Boiler Lot 2024

    Norrenergi Aktiebolag · 2024-11-11 · 400 000 000 SEK · Upphandling

    Norrenergi AB is preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. Part of the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its liftime. Originally, the boi…

  3. Carbon Capture Process Plant

    Sydskånes avfallsaktiebolag, SYSAV · 2025-11-24 · 3 000 000 000 SEK · Upphandling

    Sysav intends to build and operate a carbon capture plant connected to its waste incineration lines 3 and 4 at Spillepeng in the Northern Port of Malmö.

  4. Convection parts (boiler tubes) for Unit 1 and 4 in the Uppsala Waste incineration plant

    Vattenfall AB Procurement Heat Sweden · 2025-11-11 · 90 000 000 SEK · Upphandling

    LTE Investment for Unit 1 and 4 in the Waste incineration Plant AFA in Uppsala, Sweden. ​ The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of d…

  5. Convection parts (boiler tubes) for Unit 1 and 4 in the Uppsala Waste incineration plant

    Vattenfall AB Procurement Heat Sweden · 2026-04-02 · 41 000 000 SEK · Tilldelning

    LTE Investment for Unit 1 and 4 in the Waste incineration Plant AFA in Uppsala, Sweden. ​ The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of d…