Kårsta T1, Orkesta T1-T2 and Uddra T1 Power Transformers
- Köpare
- Ellevio AB
- Publicerad
- 2025-07-02
- Sista anbudsdag
- 2025-09-14
- Värde
- 24 000 000 SEK
- CPV-koder
- 31170000 Transformatorer
- Annons-id
- 427850-2025
AI-sammanfattningen tas fram …
Beskrivning
This procurment consists of 22/11 kV power transformers to Ellevio AB, regional sub-transmission networks, close to the town Vallentuna. The transformers will be connected to the 22 kV local network on the high voltage (HV) side, 11 kV local network on the low voltage (LV) side. Total 4 units deliveries under October 2027
Öppna originalannonsen hos TED
Liknande
-
Kårsta T1, Orkesta T1-T2 and Uddra T1 Power Transformers
Ellevio AB · 2026-05-12 · 1 SEK · Tilldelning
This procurment consists of 22/11 kV power transformers to Ellevio AB, regional sub-transmission networks, close to the town Vallentuna. The transformers will be connected to the 22 kV local network on the high voltage (HV) side, 11 kV local network on the low voltage (LV) side. Total 4 units delive…
-
6 Power Transformers 500MVA and 750MVA
Ellevio AB · 2024-09-05 · 1 SEK · Tilldelning
Ellevio plans to connect a number of 500 and 750 MVA units (3 of each) to the national transmission grid on HV side (400 kV) and to the regional grid on the LV side (140 kV) starting from end of 2026 and up into 2029. The 4 different sites are located in the mid part of Sweden.
-
Frame Agreement Power Transformers 6,3-25 MVA
Ellevio AB · 2024-04-11 · sista anbudsdag 2024-05-12 · Upphandling
Frame agreement for Power transformers type: 6,3-25 MVA., HV side 30-50 kV, LV 10-20kV. Contract duration is 4 years with possibility to extend the Contract up to 2 years (1+1). Volume commitment is 6 units per year. The estimated need during the Contract is between 12-18 units per year. The uni…
-
Frame Agreement Power Transformers 6,3-25 MVA
Ellevio AB · 2025-03-21 · 1 SEK · Tilldelning
Frame agreement for Power transformers type: 6,3-25 MVA., HV side 30-50 kV, LV 10-20kV. Contract duration is 4 years with possibility to extend the Contract up to 2 years (1+1). Volume commitment is 6 units per year. The estimated need during the Contract is between 12-18 units per year. The uni…
-
Power Transformers 500 MVA and 750 MVA, package no 2
Ellevio AB · 2025-04-15 · 1 EUR · Tilldelning
Ellevio plans to connect a number of 500 MVA (1 pcs) and 750MVA (2 pcs) units to the national transmission grid on HV side (400 kV) and to the regional grid on the LV side (140 kV) starting from end of 2026 and up into 2029. With an option of additional one 500 MVA and two 750 MVA units. The differe…